CIW construction plan

CIW_ Construction Plan

  • Case Wall - Overlap drilling
    It is a rigid retaining wall that serves as a water barrier by overlapping cast-in-place piles (CIP). During construction, the number of steps of the support is reduced with a high-stiffness retaining wall, which increases workability. During use, overlapping cast-in-place piles and structural walls resist horizontal loads (earth pressure, underground water pressure) together, making it possible to construct safe, easy-to-construct, and economical underground structures.
  • Concrete design strength 1st pile: 10~20MPa, 2nd pile: 35MPa or more
  • Construction cost reduced by 25% compared to the temporary facility CIP method
  • There are additional effects of reducing support beams, earthwork area reduction, and target structure reduction